G11 construction – Level 4, stage one concrete pour scheduled


A concrete pour is scheduled for Thursday, September 6 from 05:30 am.

Traffic control will be in place to manage traffic on University Drive from 5.30am to approximately 4.00pm.

Remember the 10kph shared pedestrian zone on University Drive, and follow all directions from traffic control. Safety first!

 

 

 

 

 

 

And come and see us for a donut at 10.00am. This week we’re checking your preferences for lounging type furniture in quiet study zones. See you soon!